ETIP Photovoltaics

Roadmap 5

KPIS

KPIs

KPIs that can be utilised for capturing progress in the above identified R&I fields are:


KPITarget Value
Optimised System Design
(Performance and Cost)

Across Functions:
Noise reduction: solar noise barriers that can be applied
irrespective of road orientation
Safety: solar crash barriers along highways, solar integrat-
ed into pavements and road roofing
Safety Against Flooding: installations on dikes
Safe Waste Storage: installations on landfills